Before it’s built, listen first.
We predict absorption, blocking, and masking outcomes straight from drawings. With a licensed Treble wave-based simulator, we run accurate low-frequency (≤ 250 Hz) simulations and compare RT60, C50, STI, and SPL distributions across material combinations—avoiding over-construction and trimming budgets. All we need are the drawings.

Process flow.
Five steps from drawing intake to report delivery. Iteration headroom is built in so material combinations can be tuned two or three times.
Brief intake
Engine matching · modeling
Per-track simulation
Auralization
Report delivery
Predict: Absorb · Block · Mask.
All three tracks are predicted quantitatively from drawings. We select the engine based on space type.
흡음 예측
차음 예측
마스킹 예측
Report structure.
Three layers of depth—contractor, supervisor, owner—each reading what they need.
When to engage.
Prediction works best between schematic design and construction documents. After that, the cost of changes rises sharply.
✓ 적합한 시점
- Schematic design complete, about to enter construction documents
- When you need to compare material combinations for selection
- New cultural facilities, performance venues, and large offices
- Projects with acoustic criteria (RT60 · STI) specified in the RFP
- When you want to give the owner a listening sample
⚠ 효과가 제한되는 경우
- Once construction has started — material changes are constrained
- Without drawings, with only a site visit
- Undecided use or movable partitions — measure alone is recommended
- Small meeting rooms ≤ 30 m² — a simple calculation suffices